State Library of Iowa
Advanced Search
About IHDC
Copyright and Ownership
History
Participating Institutions
Welcome to the Iowa Heritage Digital Collections
Browse Collections
Exhibits
Contact Us
For Depositors
Collection Development Policy
Contact Us
Digitization Resources for participants in the Iowa Heritage Digital Collections
Omeka Directions: Adding Items to Omeka
Funding Resources
Steps to Participation
Dublin Core and Item Type Metadata descriptions
Required Dublin Core Fields for Items
Search Help
Image Help
Browse Items (404 total)
Browse All
Browse by Tag
Search Items
First
Previous
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Next
Last
Sort by:
Title
Creator
Date Added
Flood ribbon cutting, The University of Iowa, August 25, 2008
Flood Progress Ribbon Cutting on plaza between the Main Library, Adler Journalism and Mass Communication Building and Samuel L. Becker Communication Studies Building. The ceremony was held on the opening day of classes to signify the accomplishment…
Flood aftermath around the Lagoon Shelter House, The University of Iowa, July 3, 2008
Photos show aftermath of flooding around the Lagoon Shelter House.
University employees discuss flood relief efforts, The University of Iowa, June 14, 2008
Workers discuss flood relief efforts. Photos taken the morning of June 14 before the Iowa River crested the following day at 31.51 feet.
Studio Arts construction, The University of Iowa, August 5, 2008
Studio Arts construction in former Menards building on Highway 6 West in Iowa City. Electrical, installation of partitions, and framing are pictured.
Studio Arts construction, The University of Iowa, August 15, 2008
Studio Arts construction in former Menards building on Highway 6 West in Iowa City. Electrical, carpentry, and flooring is pictured being installed.
Flood recovery effort at English-Philosophy Building, The University of Iowa, July 2, 2008
Photos show flood recovery efforts around the English Philosophy Building. Machine pictured is used to purify air from harmful airborne mold.
Studio Arts construction, The University of Iowa, August 1, 2008
Studio Arts construction in former Menards building on Highway 6 West in Iowa City. Installation of panels, framing, and electrical.
Sewer overflowing near Iowa Memorial Union, The University of Iowa, June 14, 2008
Photos taken the morning of June 14 before the Iowa River crested the following day at 31.51 feet.
Studio Arts in use, The University of Iowa, August 27, 2008
Studio Arts Building opens for classes. Photos taken the day the facility was in use by UI art faculty and students.
Temporary boiler at Burge Residence Hall, The University of Iowa, July 16, 2008
Images of the temporary boiler setup behind Burge Residence Hall. The boiler was needed to supply hot water until the power plant was re-opened.
First
Previous
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
Next
Last
Output Formats
atom
,
csv
,
dcmes-xml
,
json
,
omeka-xml
,
rss2