The front part of Turner Hall was erected in 1870, at a cost of $1,800. This is a frame , 35' x 50'. In September 1873, the society bought the Methodist Church building and added it to their hall. The cost of this including rebuilding, fitting up,…
The front part of Turner Hall was erected in 1870, at a cost of $1,800. This is a frame , 35' x 50'. In September 1873, the society bought the Methodist Church building and added it to their hall. The cost of this including rebuilding, fitting up,…