Browse Items (16 total)
Sort by:
A-4 structure site before picture, 1964
B&W aerial photograph of a gully before grade stabilization structure is built.
Completed B-9 structure
B&W photographs of unidentified people inspecting recently completed B-9 structure. (4)
D-10 structure site before picture, 1964
B&W photograph before a D-10 structure, a drop inlet, is built on Marvin Stansberry land.
D-10, 1964
B&W photograph of D-10 structure site before the drop inlet construction.
E-11 structure site before built, 1964
B&W aerial photograph of E-11 site on Hubert Murrow's land.
Flood prevention structure, 1969
B&W photograph of construction of a flood retarding structure. Earth fill and 42" spillway will control 3300 acre drainage area.
Grade stabilization structure B-7 in Moulton watershed, 1963
B&W aerial photograph of grade stabilization structure B-7 in Moulton watershed on Spurgeon Black land.
Moulton watershed A-1 structure site, 1963
B&W aerial photograph of "before" picture of A-1 structure site; part of Moulton watershed.
Moulton watershed, 1963
B&W aerial photograph of L. Clinkenbeard grade stabilization structure and waterway in Moulton watershed.
Moulton watershed, 1963
B&W aerial photograph of structure found on farmer Maurice Anderson's land in Moulton watershed.