Browse Items (10 total)
Sort by:
Construction of retaining wall on lower east campus, The University of Iowa, June 14, 2008
Workers construct a retaining wall on lower east campus. Photos taken the morning of June 14 before the Iowa River crested the following day at 31.51 feet.
Bulldozer brings more sandbags, The University of Iowa, June 14, 2008
Volunteers sandbag on The University of Iowa campus on Saturday, June 14, 2008.
Volunteers sandbagging outside Iowa Memorial Union, The University of Iowa, June 11, 2008
Volunteers sandbagging outside the Iowa Memorial Union on Wednesday, June 11, 2008.
