The four floors are visible in this view of the 3rd addition library construction. A small crane and bull dozer are on the right. Scaffolding is in place alongside the building.
This bas relief panel is over the second floor end window of the original library building. This and other panels on the east front of the building were designed by Nellie Verne Walker. The carving was executed by J.G. Zimmerman.
A woman is walking on the snow-cleared sidewalk along the north side of the 2nd addition construction. Scaffolding is still visible on the left. Two men are walking in the driveway on the west side of the addition.
This below ground level view shows several rebar-enforced columns. A workman is pounding in a wood reinforcement for the column. Two cement mixers and a crane are parked in the above ground parking lot.
Workmen have started work on the foundation for the 1st addition. Vertical rebars are sticking out of the foundation. A workman is operating a crane owned by Thomas Construction Company to lift a drum-shaped object. The workmens' office, two vehicles…