This view of the Knoll clearly shows the extent of the renovations that took place in 2001. There various construction vehicles parked in front of the building. The entire scene is framed by the surrounding trees.
A brick sidewalk and paved driveway go past the east side of the Knoll. The entryway is partially covered with climbing ivy and much of the building is hidden by trees and bushes.
A brick sidewalk and paved driveway go past the east side of the Knoll. The entryway is partially covered with climbing ivy and much of the building is hidden by trees and bushes.
This view of the eastern side of the Knoll shows the front entryway and open air porch. A bricked sidewalk runs in front of the house. The right tower is hidden by a large tree.
This view of the eastern side of the Knoll shows the front entryway and open air porch. A bricked sidewalk runs in front of the house. The right tower is hidden by a large tree.