The concrete foundation and two levels of the 1st addition are under construction. Vertical rebars and wooden planks are sticking up from the foundation.
Workmen have started work on the foundation for the 1st addition. Vertical rebars are sticking out of the foundation. A workman is operating a crane owned by Thomas Construction Company to lift a drum-shaped object. The workmens' office, two vehicles…
Students at study carrels along the wall of one of the newly completed 2nd Addition tiers in the library, while the shelves are in the process of being filled and labeled with call number ranges.
One page from the one millionth volume added to the Iowa State University Library collection is shown in this close-up. The page reads Vita di Lionardo da Vinci descritta daRafaelle du Fresne.
Chemical Engineering Professor W.E. Galligan, Ralph H. Suebbers, (graduate student) and Dr. Max Levine (Bacteriology) examine clay rings (produced in Ceramic Engineering Laboratory) for sewage-treatment filters as part of a general station study).