Framed by the columns in the second floor lobby, a student consults a librarian at the Card Catalog Information Desk, while many students use the card catalogs in the background.
An in-progress view of the 3rd Addition construction looking down from the fourth floor to the second floor bridge, with the circular main staircase and old building fa�ade on the left.
All four floors are visible in this view of the circular staircase in the 3rd Addition, taken from the second floor bridge. The fish soft sculpture and a banner hang on the left. On the first floor, there is a decorated Christmas tree and glass…
The circular staircase in the 3rd Addition is viewed from the second floor bridge soon after completion, before all the furniture has been put in place. The addition may not yet be open to the public because on the first floor, the card catalog area…
A dark aisle through the middle of the old library storage building is lit by overhead light bulbs, illuminating the concrete floor and little-used volumes filling the tall metal shelves.
Students at study carrels along the wall of one of the newly completed 2nd Addition tiers in the library, while the shelves are in the process of being filled and labeled with call number ranges.