Workers attempt to install water pump at Voxman Music Building as floodwater overtakes sandbag wall on Friday, June 13, 2008. The effort was too little, too late, as the sandbag wall was not enough to hold back the Iowa River floodwaters.
Workers attempt to install water pump at Voxman Music Building as floodwater overtakes sandbag wall on Friday, June 13, 2008. The effort was too little, too late, as the sandbag wall was not enough to hold back the Iowa River floodwaters.