Workers construct a retaining wall on lower east campus. Photos taken the morning of June 14 before the Iowa River crested the following day at 31.51 feet.
Partially brick depot with grass covered tracks in foreground. Porch area has doors, a sign and other lumber stacked against a wall. An old dolly sits on the porch as well.
Studio Arts Building opens for classes. Photos taken the first day the facility was used by The University of Iowa Art and Art History faculty and students.